Job title: Head of Planning Building technology / Plant infrastructure
He was born in 1963 in Győr. Since starting the production he has been employed by Audi Hungaria first as an engineer and later since 1996 as a leader.
After his posting in Germany since 2006 he is the head of building technology and infrastructure planning.
Several energy efficiency measures and significant environmental investments can be linked to its name, such as the construction of a geothermal power plant to heat Audi's factory in Győr and the installation of the largest rooftop photovoltaic power plant in Europe.
Previously attended as speaker on the following Portfolio conference: